RCRA Permit App Section D Process Information

D.1 Containers

D.1.a Permitted LTS containers

D.1.b Satellite accumulation areas and less than 90-day storage containers

D.1.c Container management practices

D.2 Tannks

D.2.a General Description of Tanks

D.2.a.(1) Leachate Storage Tanks

D.2.a.1.1 Auxiliary Tank Farm (ATF)

D.2.a.1.2 Central Tank Farm (CTF)

D.2.a.(2) Leachate Treatment System Tanks

D.2.a.2.1 LTS record documents and description of processes

D.2.b Description of proposed tanks

D.2.c Tank Management Practices

D.3 Container Buildings

D.3.a Containment building WP-2 (less than 90-day Storage)

D.3.b LTS Containment Building

D.4 Landfills

D.4.a List of wastes

D.4.b Liner and Cover System Construction

D.4.b.(1) Liner and Cover Systems of Closed Landfill Sections

D.4.b.(2) Landfill Cell Construction

D.4.c Liner System Integrity

D.4.c.(1) Internal and External Pressure Gradients

D.4.c.(2) Synthetic Liner Integrity

D.4.c.(3) Maintenance of Primary Clay Liner Integrity

D.4.c.(4) Climatic Conditions

D.4.c.(5) Installation Stresses

D.4.d Cover System Integrity

D.4.e Leachate Collection and Removal Systems

D.4.e.(1) Overview

D.4.e.(2) Design

D.4.e.2.1 Leachate Collection and Removal System (LCRS)

D.4.e.2.2 Leachate Detection, Collection and Removal System

D.4.e.2.3 Leachate Collection Lines

D.4.e.2.4 Leachate Collection Sumps and Removal Piping

D.4.e.2.5 Action Leakage Rate and Response Action Plan

D.4.f Chemical Resistance to Waste/Leachate

D.5.g Structural Strength to Prevent Collapse

D.4.h Run-on Control System

D.4.i Run-off Control System

D.4.j Particulate Control